{"trade":"awnings","week":"2025-W03","weekStart":"2025-01-13","weekEnd":"2025-01-19","fetchedAt":"2026-07-31T10:20:47.519Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"101063504","permitType":"PERMIT - SIGNS","issueDate":"2025-01-17","address":"4500 W GRAND AVE","workDescription":"64 SQ/FT AWNING WITH 1 SQ/FT OF TEXT; EAST ELEVATION","reportedCost":4000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=101063504"},{"permit":"B200405299","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2025-01-16","address":"450 E WATERSIDE DR","workDescription":"REPAIR EXISTING GLASS CANOPY. LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, EXTERIOR WORK, GLASS AWNING.","reportedCost":150000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B200405299"},{"permit":"101062630","permitType":"PERMIT - NEW CONSTRUCTION","issueDate":"2025-01-15","address":"4134 S CALUMET AVE","workDescription":"SPR 2019 CBC - NEW 3-STORY, 3-UNIT RESIDENTIAL MASONRY BUILDING, 3A CONSTRUCTION, W/ 3-STORY OPEN REAR STEEL EGRESS STAIR, REAR CONCRETE PATIO, FRONT BALCONIES @ 2ND & 3RD FLOORS, STAIR ENCLOSURE @ ROOF W. ADJACENT 9'X15' ROOF CANOPY, PRIVATE ROOF DECK, AND 3-CAR CONCRETE PARKING PAD, PER PLAN**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **","reportedCost":400000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=101062630"},{"permit":"101062629","permitType":"PERMIT - NEW CONSTRUCTION","issueDate":"2025-01-15","address":"4132 S CALUMET AVE","workDescription":"NEW 3-STORY, 3-UNIT RESIDENTIAL MASONRY BUILDING, 3A CONSTRUCTION, W/ 3-STORY OPEN REAR STEEL EGRESS STAIR, REAR CONCRETE PATIO, FRONT BALCONIES @ 2ND & 3RD FLOORS, STAIR ENCLOSURE @ ROOF W. ADJACENT 9'X15' ROOF CANOPY, PRIVATE ROOF DECK, AND 3-CAR CONCRETE PARKING PAD, PER PLAN**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **","reportedCost":400000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=101062629"},{"permit":"101062628","permitType":"PERMIT - NEW CONSTRUCTION","issueDate":"2025-01-15","address":"4130 S CALUMET AVE","workDescription":"NEW 3-STORY, 3-UNIT RESIDENTIAL MASONRY BUILDING, 3A CONSTRUCTION, W/ 3-STORY OPEN REAR STEEL EGRESS STAIR, REAR CONCRETE PATIO, FRONT BALCONIES @ 2ND & 3RD FLOORS, STAIR ENCLOSURE @ ROOF W. ADJACENT 9'X15' ROOF CANOPY, PRIVATE ROOF DECK, AND 3-CAR CONCRETE PARKING PAD, PER PLAN**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & AUDIT **","reportedCost":400000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=101062628"},{"permit":"101063413","permitType":"PERMIT - SIGNS","issueDate":"2025-01-14","address":"2949 W DEVON AVE","workDescription":"INSTALLATION OF AWNING WITH GRAPHICS AT ALDERMAN DEBRA SILVERSTEIN 50TH WARD (2949 W DEVON AVE., CHICAGO, IL 60659)(TEXT/LOGO 31 SQ.FT.)","reportedCost":1500,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=101063413"}]}