{"trade":"ev-charging","week":"2019-W23","weekStart":"2019-06-03","weekEnd":"2019-06-09","fetchedAt":"2026-08-02T14:38:19.993Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B100823897","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2019-06-05","address":"2204 W CHICAGO AVE","workDescription":"TESLA EV CHARGER NEMA 14-50R $1,235.00 1. FURNISH AND INSTALL (1) 30 AMP, 240 VOLT, 3 WIRE DEDICATED CIRCUIT. 2. PROPOSAL INCLUDES RUNNING CIRCUIT THROUGH EXISTING GARAGE CONDUIT AND THEN EXTENDING CONDUIT TO PARKING SPACE ONCE INSIDE OF THE GARAGE. 1/2\" CONDUIT WILL BE SURFACE MOUNTED IN THE GARAGE. 3. CIRCUITRY WILL CONSIST OF (2) #10 AWG THHN COPPER CONDUCTORS AND (1) #10 AWG THHN GROUNDING CONDUCTOR. 4. FURNISH AND INSTALL (1) NEMA 10-30R. RECEPTACLE WILL BE LOCATED BY YOUR PARKING SPACE ON THE WEST GARAGE WALL, CLOSER TO THE BAY DOOR. 5. RECEPTACLE WILL DELIVER 22 AMPS AND PROVIDE 20 MILES PER HOUR OF CHARGE. (MODEL 3) 6. FURNISH AND INSTALL (1) 30 AMP, 2 POLE BREAKER. 7. PROVIDE (1) LOAD CALCULATION FOR THE HOUSE PANEL INCLUDING THE NEW TESLA CHARGER.  PERMIT $250.00 1. COORDINATE ALL PAPERWORK AND NEEDED SITE INSPECTIONS WITH THE CITY OF CHICAGO. 2. PROPOSAL INCLUDES PERMIT, PERMIT FEES OR PERMIT ASSOCIATED FEES.  TOTAL COST: $1,485.00","reportedCost":1485,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100823897"}]}