{"trade":"ev-charging","week":"2021-W28","weekStart":"2021-07-12","weekEnd":"2021-07-18","fetchedAt":"2026-08-01T13:13:07.530Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B100931251","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-17","address":"4860 N CLARK ST","workDescription":"INSTALL CHARGE POINT EVSE UNIT IN PARKING SPACE E","reportedCost":4500,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100931251"},{"permit":"B100931440","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-17","address":"2329 N JANSSEN AVE","workDescription":"INSTALL NEW SERVICE ON GARAGE WITH HOURLY PRICING AND AN EVSE UNIT ALONG WITH 3 ADDITIONAL GFCI RECEPTACLES","reportedCost":4000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100931440"},{"permit":"B100931253","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-17","address":"2329 N JANSSEN AVE","workDescription":"INSTALL NEW OVERHEAD SERVICE ON GARAGE ON HOURLY PRICING PLAN AND ADD A TESLA EVSE UNIT IN GARAGE","reportedCost":3500,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100931253"},{"permit":"B100931258","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-17","address":"27 N ABERDEEN ST","workDescription":"INSTALL TESLA WALL CONNECTOR EVSE UNIT IN PARKING GARAGE SPACE 45","reportedCost":2500,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100931258"},{"permit":"B100931448","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-17","address":"1244 W MONROE ST","workDescription":"INSTALL A CHARGEPOINT EVSE UNIT IN GARAGE","reportedCost":1200,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100931448"},{"permit":"B100931449","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-17","address":"2426 W BELDEN AVE","workDescription":"INSTALL NEW 30A CIRCUIT FOR NEWMA10/30 RECEPTACLE FOR EV CHARGING","reportedCost":1000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100931449"},{"permit":"B100930886","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-07-16","address":"1225 W MORSE AVE","workDescription":"TESLA EV CHARGER NEMA 14-50R 1 $1,750.00 1. FURNISH AND INSTALL (1) 50 AMP, 240 VOLT, 4 WIRE DEDICATED CIRCUIT. 2. PROPOSAL INCLUDES RUNNING (1) 3/4\" RIGID EMT CONDUIT INSTALLED FROM EXISTING 200 AMP PANEL IN THE ELECTRICAL ROOM TO THE GARAGE PARKING SPOT. 3. CONDUIT WILL BE SURFACE MOUNTED IN THE GARAGE. 4. CIRCUITRY WILL CONSIST OF (3) #6AWG THHN COPPER CONDUCTORS AND (1) #10 AWG THHN GROUNDING CONDUCTOR. 5. FURNISH AND INSTALL (1) NEMA 14-50R. RECEPTACLE WILL BE LOCATED CENTERED ON THE BACK GARAGE WALL AT THE PARKING SPOT. 6. RECEPTACLE WILL DELIVER 32 AMPS AND PROVIDE 30 MILES PER HOUR OF CHARGE. (MODEL 3) 7. FURNISH AND INSTALL (1) 50 AMP, 2 POLE BREAKER. 8. PROVIDE (1) LOAD CALCULATION FOR THE HOUSE PANEL INCLUDING THE NEW TESLA CHARGER. 9. FIRE CAULK PENETRATIONS THROUGH THE FLOOR AND INTO THE ELECTRICAL ROOM. EV CIRCUIT SUB METER $565.00 1. FURNISH AND INSTALL (1) LEVITON BRAND SUB METER TO MONITOR ELECTRICITY USAGE OF THE EV CHARGER.","reportedCost":2135,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100930886"}]}