{"trade":"ev-charging","week":"2021-W38","weekStart":"2021-09-20","weekEnd":"2021-09-26","fetchedAt":"2026-08-01T11:16:30.463Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B100941291","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-09-24","address":"4040 N BELL AVE","workDescription":"INSTALL 240V 40AMP CIRCUIT TO EXISTING 200A PANEL.  3/4\" CONDUIT (2-6AWG, 1-10AWG (GND)) TO GARAGE FOR EVSE.","reportedCost":2500,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100941291"},{"permit":"B100940188","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-09-21","address":"60 E MONROE ST","workDescription":"60 AMP EV CHARGER 240 VOLT SINGLE PHASE","reportedCost":4528,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100940188"},{"permit":"B100940735","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2021-09-21","address":"25 E SUPERIOR ST","workDescription":"INSTALL EVSE IN PARKING SPACE","reportedCost":4350,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100940735"}]}