{"trade":"ev-charging","week":"2023-W28","weekStart":"2023-07-10","weekEnd":"2023-07-16","fetchedAt":"2026-07-31T12:24:42.255Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B101023317","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2023-07-14","address":"2673 N GREENVIEW AVE","workDescription":"UNIT D   INSTALLATION OF ONE (1) HARD-WIRED LEVEL 2 CHARGER -INSTALLATION OF A (N) 2-POLE 60A BREAKER ON (E) 200A SERVICE TO FEED THE LEVEL 2 CHARGER. -MAIN SERVICE GE PANEL (MSP) LOCATED INSIDE THE GARAGE. -EV CHARGER TO BE WALL-MOUNTED INSIDE THE GARAGE WITHIN 10FT FROM MSP.","reportedCost":950,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101023317"},{"permit":"B101023431","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2023-07-12","address":"800 N MICHIGAN AVE","workDescription":"NEW TRANSFORMER AND 50 AMP 240 VOLT EV CHARGER OUTLET WITH BUILDING GROUND FOR TRANSFORMER.","reportedCost":10200,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101023431"}]}