{"trade":"ev-charging","week":"2024-W21","weekStart":"2024-05-20","weekEnd":"2024-05-26","fetchedAt":"2026-07-31T09:30:52.583Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B101051891","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2024-05-26","address":"1276 N CLYBOURN AVE","workDescription":"INSTALL (2) 60AMP BREAKERS FOR (4) L2 -EV CHARGERS IN PARKING LOT. EACH 60AMP BREAKER WILL LOAD MANAGE (2) EV CHARGERS. MAX POWER OUTPUT RATING PER BREAKER WHEN (1) CHARGER IN USE WILL BE (11.5KW) 48AMPS. 24 AMPS(5.7KW) OUTPUT EACH WHEN BOTH IN USE.  (2) EV CHARGERS/PEDESTAL","reportedCost":23000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101051891"},{"permit":"B101051873","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2024-05-24","address":"2750 W NORTH AVE","workDescription":"INSTALL POWER TO ONE NEW OWNER PROVIDED EV CHARGING STATION. INSTALL 80 AMP CIRCUIT BREAKER IN EXISTING MAIN DISTRIBUTION PANEL. INSTALL NEW 80 AMP CONDUIT AND WIRE MOUNTED TO THE EXTERIOR OF THE BUILDING. MOUNT EV CHARGING STATION TO WALL. TEST AND TRAIN.","reportedCost":6300,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101051873"},{"permit":"B101051668","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2024-05-22","address":"400 E 71ST ST","workDescription":"ENERGIZE 2 EV CHARGERS","reportedCost":6000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101051668"}]}