{"trade":"ev-charging","week":"2024-W30","weekStart":"2024-07-22","weekEnd":"2024-07-28","fetchedAt":"2026-07-31T09:31:28.596Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B101056396","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2024-07-26","address":"901 E 95TH ST","workDescription":"INSTALL 2 EV CHARGERS","reportedCost":2000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101056396"},{"permit":"B101056186","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2024-07-24","address":"1901 S CALUMET AVE","workDescription":"NO CHARGERS SHALL BE ENERGIZED UNTIL ALL WORK RELATED TO PERMIT#101050432 HAS RECEIVED FINAL INSPECTION APPROVAL. INSTALLATION OF (35X) NEW NEXTECH ELECTRIC VEHICLE CHARGERS. (8X) REPLACE EXISTING STAND-ALONE CHARGERS ON SAME PANEL/CIRCUIT - ONE CHARGER PER CIRCUIT. (27X) WILL BE POWERED FROM THE NEW 600A PANEL FROM PERMIT#101050432 AND CLOUD MANAGED TOGETHER.","reportedCost":17000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101056186"},{"permit":"100994216","permitType":"PERMIT - NEW CONSTRUCTION","issueDate":"2024-07-22","address":"1237 N CALIFORNIA AVE","workDescription":"FULL BUILDING PERMIT FOR SPRINKLERED 6-STORY, 40 DWELLING UNIT MULTI-FAMILY RESDIENTIAL ONLY BUILDING WITH AN ATTACHED 14-CAR GARAGE ACCESSED BY A PUBLIC ALLEY WITH 2 ACCESSIBLE SPACES & 5 SPACES EVSE-READY, 7 UNENCLOSED PARKING SPACES, 1 UNENCLOSED LOADING ZONE, 40 ENCLOSED BICYCLE SPACES & AN ENCLOSED TRASH FACILITY AT GROUND FL.  (OCCUPANCY GROUPS R-2; TYPE IIA CONSTRUCTION).","reportedCost":13307685,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=100994216"},{"permit":"B101054965","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2024-07-22","address":"1631 W LE MOYNE ST","workDescription":"INSTALLATION OF A 50-AMP RECEPTACLE FOR AN ELECTRIC VEHICLE CHARGER IN THE GARAGE. 50FT OF 3/4\" CONDUIT WILL BE INSTALLED FROM THE GARAGE TO THE BUILDING ELECTRICAL PANEL.","reportedCost":1950,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101054965"}]}