{"trade":"ev-charging","month":"2016-02","monthStart":"2016-02-01","monthEnd":"2016-02-29","fetchedAt":"2026-08-04T11:25:58.178Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"total":1,"totalReportedCost":3920,"costedCount":1,"largestReportedCost":3920,"truncated":false,"permits":[{"permit":"B100635229","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2016-02-15","address":"1929 N ORCHARD ST","workDescription":"FURNISH AND INSTALL ONE SURFACE MOUNTED 240VOLT 50AMP 1-PHASE 4-WIRE NEMA 14-50R OUTLET IN NEW LOCATION IN GARAGE FOR AN ELECTRIC VEHICLE WALL CONNECTOR. FURNISH AND INSTALL ONE 1\" CONDUIT SYSTEM WITH 3 #6 THHN COPPER CONDUCTORS AND ONE #10 THHN COPPER GROUNDING CONDUCTOR FROM EXISTING PANEL IN FURNACE TO NEW OUTLET IN GARAGE.","reportedCost":3920,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100635229"}],"recordLimit":100}