{"trade":"ev-charging","month":"2020-08","monthStart":"2020-08-01","monthEnd":"2020-08-31","fetchedAt":"2026-08-01T22:54:49.547Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"total":7,"totalReportedCost":17154,"costedCount":7,"largestReportedCost":4100,"truncated":false,"permits":[{"permit":"B100885601","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-04","address":"1901 S CALUMET AVE","workDescription":"INSTALL A 20A 240V NEMA6/20 RECEPTACLE FOR TESLA EV CHARGING ON 3RD FLOOR PARKING SPACE 158","reportedCost":4100,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100885601"},{"permit":"B100885614","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-04","address":"25 E SUPERIOR ST","workDescription":"INSTALL A NEW 480V STEP DOWN TRANSFORMER AND NEMA6/50 RECEPTACLE FOR TESLA EV CHARGING","reportedCost":4000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100885614"},{"permit":"B100885591","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-04","address":"1155 N DEARBORN ST","workDescription":"INSTALL EV CHARGER AT PARKING SPACE ON 3RD FLOOR","reportedCost":2800,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100885591"},{"permit":"B100889033","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-28","address":"1903 W IRVING PARK RD","workDescription":"FURNISH AND INSTALL A 30 AMP FEED FOR AN ELECTRIC VEHICLE","reportedCost":1704,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100889033"},{"permit":"B100888013","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-21","address":"3620 N FREMONT ST","workDescription":"TESLA EV CHARGER NEMA 14-50R $1,650.00 1. FURNISH AND INSTALL (1) 50 AMP DEDICATED CIRCUIT. PROPOSAL INCLUDES USING EXISTING 3/4\" CONDUIT ALREADY INSTALLED TO THE GARAGE FROM THE 100 AMP PUBLIC PANEL. CONDUIT WILL BE SURFACE MOUNTED IN THE GARAGE. 2. CIRCUITRY WILL CONSIST OF (3) #6AWG THHN COPPER CONDUCTORS AND (1) #10 AWG THHN GROUNDING CONDUCTOR. 3. INSTALL (2) OWNER FURNISHED JUICEBOX EV CHARGERS. CHARGERS WILL BE LOCATED 4-5' APART. 4. FURNISH AND INSTALL (1) 50 AMP, 2 POLE BREAKER. 6. PROVIDE (1) LOAD CALCULATION FOR THE HOUSE PANEL INCLUDING THE NEW TESLA CHARGER.","reportedCost":1650,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100888013"},{"permit":"B100885594","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-04","address":"711 W GRAND AVE","workDescription":"INSTALL TESLA EV CHARGER IN PARKING GARAGE","reportedCost":1600,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100885594"},{"permit":"B100885606","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2020-08-04","address":"2022 W CHURCHILL ST","workDescription":"INSTALL TESLA EV CHARGER IN DETACHED GARAGE","reportedCost":1300,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100885606"}],"recordLimit":100}