{"trade":"ev-charging","month":"2022-05","monthStart":"2022-05-01","monthEnd":"2022-05-31","fetchedAt":"2026-08-01T02:09:01.444Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"total":2,"totalReportedCost":13800,"costedCount":2,"largestReportedCost":10000,"truncated":false,"permits":[{"permit":"B100972165","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2022-05-17","address":"1101 W WAVELAND AVE","workDescription":"1.   FURNISH AND INSTALL 1 - 200 AMP, SINGLE PHASE, 120 / 208-VOLT SERVICE ENTRANCE DISCONNECT SWITCH ADJACENT TO EXISTING METER/SERVICE DROP.  2.   DIRECTIONAL BORE 1 - 2\" POLY CONDUIT APPROXIMATELY 100'. 3.   FURNISH AND INSTALL ONE (1), 200 AMP, MB, SINGLE PHASE, 120 / 240-VOLT NEMA 3R PANELBOARD.  4.   FURNISH AND INSTALL TWO (2), SERIES 7 DUAL EV CHARGING STATIONS.  5.   FURNISH AND INSTALL NEW FEEDS FROM THE NEW PANEL TO NEW EV CHARGING STATIONS.","reportedCost":10000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100972165"},{"permit":"B100969916","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2022-05-19","address":"60 E MONROE ST","workDescription":"40 AMP 240 VOLT EV CHARGER","reportedCost":3800,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100969916"}],"recordLimit":100}