{"trade":"ev-charging","month":"2023-01","monthStart":"2023-01-01","monthEnd":"2023-01-31","fetchedAt":"2026-07-31T17:32:23.741Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"total":3,"totalReportedCost":605884,"costedCount":3,"largestReportedCost":600000,"truncated":false,"permits":[{"permit":"B101000961","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2023-01-18","address":"600 N LAKE SHORE DR","workDescription":"**ELECTRICAL ONLY PERMIT**WE ARE INSTALLING THE COMPLETE ELECTRICAL INFRASTRUCTURE FOR 107 EV CHARGERS IN BUILDING GARAGE AND PARKING SPACES. THIS WILL INCLUDE: ADDITIONAL 1200A SERVICE FROM COMED VAULT INSIDE OF BUILDING, WHICH THERE IS SUFFICIENT POWER TO ENERGIZE FROM LOCATION TO NEW 1200A SWITCHGEAR. NEW CONDUIT AND WIRING, NEW PANELS TO SUPPLY 40A TO EACH SPACE ON MANAGED LOAD EV CHARGING SYSTEM BY ENEL X WAY.","reportedCost":600000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101000961"},{"permit":"B101000360","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2023-01-05","address":"3914 N FRANCISCO AVE","workDescription":"INSTALL A 50 AMP 240V CIRCUIT IN DETACHED GARAGE TO SERVICE EVSE","reportedCost":3884,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101000360"},{"permit":"B101002888","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2023-01-20","address":"4062 N KOSTNER AVE","workDescription":"UPGRADE SERVICE FROM 100 TO 200 AMPS. INSTALL A 50A 240V CIRCUIT TO THE GARAGE FOR EV CHARGING.","reportedCost":2000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B101002888"}],"recordLimit":100}