{"trade":"excavation","week":"2022-W29","weekStart":"2022-07-18","weekEnd":"2022-07-24","fetchedAt":"2026-08-01T01:17:18.056Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"100932930","permitType":"PERMIT - RENOVATION/ALTERATION","issueDate":"2022-07-21","address":"2233 W DIVISION ST","workDescription":"SPR 2019 CBRC: ERECT 1-STORY ADDITION TO EXISTING HOSPITAL FOR NEW MRI UNIT, WITH FOUNDATION WITH DRILLED CAISSONS, AS PER PLANS. (OCCUPANCY I-2 GROUP; TYPE 1A CONSTRUCTION)","reportedCost":2080462,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=100932930"},{"permit":"100954497","permitType":"PERMIT - NEW CONSTRUCTION","issueDate":"2022-07-20","address":"11601 W TOUHY AVE","workDescription":"DDS PRE-2019 CODE: PHASE 2 AA ORD CONCOURSE  L 3-GATE EXPANSION, PERMIT FOR DEEP FOUNDATION INCLUDING CAISSONS INSTALLATION  FOR  PROPOSED AMERICAN AIRLINES ADDITION OF NEW 3 GATES (TO PHASE-1, EXISTING 5 GATES ADDITION IN 2017), APPROX. 11,365 SF AT L STINGER, 2-STORY BUILDING, ADJACENT TO TERMINAL 3 AT O'HARE INTERNATIONAL AIRPORT, AS PER PLANS. CDA PROJECT NUMBER H1215.19-02. CONSULTANT REVIEWER: V3 COMPANIES","reportedCost":1400375,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=100954497"},{"permit":"100959927","permitType":"PERMIT - NEW CONSTRUCTION","issueDate":"2022-07-19","address":"150 E ONTARIO ST","workDescription":"2019 CBC: DIRECT DEVELOPER SERVICES CAISSON AND FOUNDATION (TO INCLUDE CONCRETE ARCHITECTURAL COMPONENTS UP TO LEVEL O1 SLAB) ONLY NEW CONSTRUCTION OF A 28-STORY, 390 ROOM HOTEL BUILT OUT OF PRE-CAST AND CAST-IN-PLACE CONCRETE W/ BASEMENT AS PER PLANS. *CONSULTANT REVIEWER - GLOBETROTTERS ENGINEERING*","reportedCost":70000000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=100959927"}]}