{"trade":"fire-sprinkler","week":"2021-W13","weekStart":"2021-03-29","weekEnd":"2021-04-04","fetchedAt":"2026-08-01T15:48:47.277Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"100867565","permitType":"PERMIT - RENOVATION/ALTERATION","issueDate":"2021-04-01","address":"1611 W HARRISON ST","workDescription":"CURRENT USE/OCCUPANCY: H-2, UTILITY TUNNEL WILL REMAIN THE SAME (S-1 PER NEW CBC). THE SCOPE OF WORK INCLUDES THE ADDITION OF (2) 24\" CHILLED WATER PIPES (SUPPLY AND RETURN) IN THE EXISTING HARRISON UTILITY TUNNEL. TWO EXIST CMU PARTITIONS WILL BE REMOVED AND NEW CMU WALLS WILL BE ADDED. MINOR LIGHTING AND SPRINKLER LAYOUTS CHANGES. EXISTING EGRESS PATH/EXITS WILL REMAIN AS-IS.","reportedCost":500000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=100867565"}]}