{"trade":"solar","week":"2012-W08","weekStart":"2012-02-20","weekEnd":"2012-02-26","fetchedAt":"2026-08-06T21:42:38.982Z","source":{"dataset":"ydr8-5enu","api":"https://data.cityofchicago.org/resource/ydr8-5enu.json","page":"https://data.cityofchicago.org/Buildings/Building-Permits/ydr8-5enu"},"ok":true,"error":null,"truncated":false,"permits":[{"permit":"B100429423","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"2940 N ASHLAND AVE","workDescription":"INSTALL NEW 150A 277/480V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (1) 100A 277/480V 3P 4W LEVEL III CHARGING STATION, (3) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. JOB# 633-143","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429423"},{"permit":"B100429417","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"101 W 87TH ST","workDescription":"INSTALL NEW 150A 277/480V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (1) 100A 277/480V 3P 4W LEVEL III CHARGING STATION, (3) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. PLEASE BE SURE TO PROVIDE UNIT SERIAL NUMBERS AND MAC ID NUMBERS ON THE WORK ORDER. JOB# 633-151","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429417"},{"permit":"B100429421","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"1945 W WILSON AVE","workDescription":"INSTALL NEW 125A 120/208V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (2) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. JOB# 633-148","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429421"},{"permit":"B100429425","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"3201 S STATE ST","workDescription":"INSTALL NEW 150A 277/480V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (1) 100A 277/480V 3P 4W LEVEL III CHARGING STATION, (1) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. JOB#633-152","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429425"},{"permit":"B100429420","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"1401 W DEVON AVE","workDescription":"INSTALL NEW 125A 120/208V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (2) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. JOB# 633-147","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429420"},{"permit":"B100429427","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"5343 N BROADWAY","workDescription":"INSTALL NEW 150A 277/480V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (1) 100A 277/480V 3P 4W LEVEL III CHARGING STATION, (2) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE.  JOB# 633-149","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429427"},{"permit":"B100429428","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"5516 N CLARK ST","workDescription":"INSTALL NEW 125A 120/208V 3P-4W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (2) 40A 208V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 208V 10KW SOLAR CANOPY. THE INSTALLATION WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. JOB# 633-150","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429428"},{"permit":"B100429426","permitType":"PERMIT – EXPRESS PERMIT PROGRAM","issueDate":"2012-02-24","address":"3365 W LAWRENCE AVE","workDescription":"INSTALL NEW 125A 120/240V 1P-3W SERVICE TO THE NEW METER AND POWER DISTRIBUTION MODULE (PDM).  THE PDM INCLUDES ALL THE DISTRIBUTION TO FEED; (2) 40A 240V 2P-2W LEVEL II CHARGING STATIONS AND A FUTURE 240V 10KW SOLAR CANOPY. THIS INSTALL IS FOR THE IGO INSTALLATION.  INSTALL NEW 100A 120/240V 1P-3W SERVICE TO THE NEW METER.  IN THE IGO PDM, INCLUDE ALL THE DISTRIBUTION TO FEED; (2) 40A 240V 2P-2W LEVEL II CHARGING STATIONS.  THIS INSTALL IS FOR THE ZIP CARS.  THE TWO INSTALLATIONS WILL INCLUDE ALL THE NECESSARY CONDUIT, WIRE AND ASSOCIATED HARDWARE TO COMPLETE THE INSTALL TO LOCAL CODE. JOB# 633-137","reportedCost":20000,"cityRecordUrl":"https://data.cityofchicago.org/resource/ydr8-5enu.json?permit_=B100429426"}]}