KOVA SIGNALS

Permit Signal · For Chicago contractors

The earliest anyone can see a job coming is the day its permit is filed.

Permit Signal is every new Chicago commercial permit in your trade, connected and delivered the day it’s filed — address, scope, reported cost, who’s attached. Read each morning from the City’s own published file, with the City’s own record linked on every row, so you can check us before you believe us.

Express permits · this week

466

165 with electrical scope · ydr8-5enu · week of 2026-07-22 · pulled 2026-07-29

Renovation + new construction · this week

185

ydr8-5enu · week of 2026-07-22 · pulled 2026-07-29

Sign permits · this week

32

ydr8-5enu · week of 2026-07-22 · pulled 2026-07-29

Wrecking permits · this week

16

ydr8-5enu · week of 2026-07-22 · pulled 2026-07-29

A live look. Three real permits from this week.

Pulled from the file exactly as a subscriber would see them — one new construction, one electrical, one signs. Every link is the City of Chicago’s own record. Check them before you read another line.

Three real Chicago permits from the week of 2026-07-22
FiledAddressWorkTradeReported costSource
2026-07-241144 W Loyola AveNew construction: 6-floor plus basement concrete buildingGeneral contractor$162,000,000city record
2026-07-2710000 W O'Hare AirportLow-voltage/communication electrical work, Terminal 3 L ConcourseElectrical$1,094,100city record
2026-07-23939 S Western AveReplace static off-premise sign with 60 SF dynamic image displaySigns$45,000city record
Permits issued 2026-07-22 through 2026-07-29 · pulled 2026-07-29 from City of Chicago dataset ydr8-5enu · each link returns that permit's record

Coverage was not thin anywhere that week: 32 sign permits, 16 wrecking permits, 185 renovation and new-construction filings, and 165 express permits with electrical scope (same dataset, same pull, 2026-07-29). Your feed is cut to your trade. The permit signal is Chicago — that is where the public data is good enough to work from.

The feed, daily

Read at 07:00. Cut to your trade. Delivered the same morning.

01 READ

Every morning at 07:00 America/Chicago the engine reads the City's building-permit file — the same public dataset anyone can open, no login, no vendor in the middle. The file runs one day behind the counter: on 2026-07-29 its newest permit was issued 2026-07-28. We print that lag rather than round it away.

ydr8-5enu · daily 07:00 America/Chicago · lag 1 day

02 CUT

The file is cut to trades, and the filters are kept current by hand. That matters more than it sounds: in July 2026 the City retired the ELECTRIC WIRING permit type and electrical work moved under the Express Permit Program. A filter keyed to the old label returns zero rows and no error. Ours follows the records, not the label.

signs 32 · wrecking 16 · renovation + new construction 185 · electrical-scope express 165 — week of 2026-07-22, pulled 2026-07-29

03 DELIVER

The new records in your trade go out the same morning — address, scope, reported cost, who's attached — with the City's own record linked on every row, so you can check any line against the register before you drive to it.

source link on every row · no dashboards to learn — it's an email

Next morning read

--:--:--

07:00 America/Chicago, daily — the file refreshes whether anyone is watching or not

We are not guessing who is busy. It is a matter of public record.

The City of Chicago publishes every building permit it issues, including who pulled it. We read that file. Here is what it says right now.

Measured figures from the Chicago building permit file
FigureWhat it isSource
2,744Permits issued in the last 30 daysCity of Chicago ydr8-5enu · 2026-07-29
1,998Distinct contractors pulled at least one of themCity of Chicago ydr8-5enu · 2026-07-29
5,319Distinct contractors appear across the last 90 daysCity of Chicago ydr8-5enu · 2026-07-29
25Firms that grew their permit volume by 40% or more month over month, counting only those with at least four permits in the current month. That count has held between 18 and 29 across each of the last six 30-day windows.City of Chicago ydr8-5enu · 2026-07-29
1 dayHow far behind the file runs — the most recent permit in it was issued 2026-07-28City of Chicago ydr8-5enu · 2026-07-29
Measured 2026-07-29 against City of Chicago building permits, dataset ydr8-5enu. Reproducible with the query script in-repo.

If you are one of the 25, you already know. The permits went up, the paperwork went up faster, and nothing about how you run the office changed. That is the only reason we are talking to you.

Pricing

Three tiers. You start at the bottom one.

The self-serve and enriched tiers are the same file, read for every subscriber — nothing divides when a second firm joins. Only the territory tier is exclusive, and it is the premium option, not the spine.

Self-serve feed

$249/mo

The raw feed. Every new Chicago commercial permit, delivered the morning it appears in the City's file.

  • Address, scope, reported cost, who's attached
  • The City's own record linked on every row
  • Delivered daily after the 07:00 read

The founding rate below applies to this tier.

Enriched

$750–1,000/mo

The feed cut to your trade and enriched with decision-maker contact info, so the record arrives with someone to call.

Everything in Self-serve, plus:

  • Filtered to your trade
  • Decision-maker contact info on the record

Checkout starts the band at $750/mo.

Exclusive territory

$2,500/mo

The enriched feed in your trade and territory, sold to one firm and no one else.

Everything in Enriched, plus:

  • One firm per trade and territory
  • When a territory is taken, it comes off this page

A territory must be confirmed open before money is taken — so this tier starts with an email, not a card form.

Founding rate · 9-for-12 prepay

The first five Illinois subscribers lock $249/month for life — the price rises after that. Pay 9 months up front — $2,241 — and you get 12.

The prepay is 9 × $249 for a 12-month term on the self-serve feed. Founding slots are counted, not invented — when the five are gone, this band comes down.

Ask if a founding slot is left

Not ready to pay? Right — you have not seen the feed yet. Three real permits in your trade are free, and the price of asking is one email.

FAQ

Asked before you had to ask.

This is public data. Why would I pay you for it?

You should not pay for access, so we do not sell access. The dataset is open, free and unauthenticated, and its ID is printed all over this page precisely so you can go around us. What subscribers pay for is the reading: 2,744 permits crossed the file in the last 30 days (measured 2026-07-29), across every trade at once, and the one that matters to you is only worth something the morning it appears.

Here is what reading it yourself actually costs. In July 2026 the City retired the PERMIT - ELECTRIC WIRING permit type — it now returns zero records, all-time. Electrical work moved under PERMIT – EXPRESS PERMIT PROGRAM, spelled with an en-dash, not a hyphen; a query with the wrong dash matches zero rows. A DIY script keyed to the old type ships an empty electrical feed and never throws an error — it just goes quiet, and looks exactly like a slow week. We caught the change on 2026-07-29 while building sample packets: 165 electrical-scope express permits that week that the old filter would have silently missed. That is the product — not the file, the noticing.

When does the feed arrive?

The engine reads the City’s file at 07:00 America/Chicago every day, and the new records in your trade go out the same morning. One caveat, printed at the same weight as the promise: the City’s file itself runs about one day behind the counter — on 2026-07-29 its newest permit was issued 2026-07-28. We deliver the day a permit appears in the file, which is the earliest anyone outside the permit office can see it.

Can I cancel?

Yes — it is a monthly subscription and you can cancel at any time. No term, no exit call, no retention flow. If the feed ever stops being worth it, cancelling should be the obvious thing to do; we would rather you did that than keep paying for a login. The one exception is the 9-for-12 prepay, which is a 12-month term paid up front — that is the deal, and it is stated next to the price, not here.

What does “exclusive territory” actually mean?

One firm per trade and territory at $2,500/mo, and no one else gets that cut of the feed while you hold it. The other two tiers are deliberately not exclusive — every subscriber reads the same connected file, so nothing divides when a second firm joins. A territory must be confirmed open before money is taken; when one is sold, it comes off the page.

What does enrichment add?

Two things. The feed is filtered to your trade, so you stop scanning plumbing rows to find sign jobs. And each record carries decision-maker contact info, so it arrives with someone to call instead of just an address. The underlying records are identical to the self-serve tier — enrichment changes what is attached to them, never what is in them.

Where does the data come from?

One source: the City of Chicago’s building-permit dataset, ydr8-5enu on the City’s own data portal. Public, no login, no rate card, no data broker in the middle. Every number on this page was measured against it on the date printed beside the number, and every record in the feed links back to the City’s own copy of itself. Run the same queries; you will get the same counts.

How do you know my permit volume?

Because the City publishes it. The dataset names the contractor on every permit, and we do not hold anything about you that you cannot pull yourself in a browser in about ten seconds. What we hold is your firm name, your trade, your business mailing city and ZIP, and two numbers: permits last month, permits this month. No personal contact details, no home addresses, no financial data. We did not buy your information from anyone. Reply once and we delete the record.

What happens to my information if I say no?

We remove the record and you do not hear from us again. We do not sell, share or rent anything, and there is nothing to sell — everything we have came from a public City file that anyone can download.

Do you cover residential work, or cities other than Chicago?

The feed is Chicago commercial permits. The permit signal is Chicago — that is where the public data is good enough to work from: named contractors, daily publication, a one-day lag. Other cities’ equivalents run months stale or publish no dates at all, and we will not sell a feed we cannot measure. If a second city ever clears the same bar, it will show up here with its own measured numbers first.

How does the 9-for-12 prepay work?

Pay 9 months up front — $2,241, which is 9 × $249 — and you get 12 months of the self-serve feed. Separately, the first five Illinois subscribers lock $249/month for life; the price rises after that. Five is a count, not a countdown timer — when the slots are gone, the offer comes off the page.

The reverse demo

Three real permits in your trade, from this week, free — the City’s own record linked on every one. Check them first. Then decide if this is the email you want every morning.